- PRODUCT CENTER -

Metal structure building - C-shaped structural material - Structured galvanized C steel purlins
0086 15650580332
+86 15650580332
nini@jiekesteelstructure.com
Contact Us

Product Parameters

Product NameC/Z Steel Purlin
StandardAISI,STM,BS,DIN,GB,JIS
MaterialQ235B/Q345B
SurfaceGalvanized & Black & 55% Aluzinc or as your request
Surface treatmentpolish;painted;galvanzied;punched600mm-1500mm or as required
Length1-12m or as request
Thickness1.5mm-3.0mm
TechniqueHot rollled/cold rolled
Section size40--500mm
Holesthree dimension holes punch according drawings
Processing ServicePunching,Cutting
ApplicationSupporting System

详情_画板 1 副本 33

111_画板 1 副本

Product display

详情_画板 1 副本 32

Factory production process

详情_画板 1 副本

Drawing design

详情-03

Customer Project Case

项目案例-04

Project Location: Africa
Total Site Area: 13,530.58 ㎡
Total Floor Area: 15,663.90 ㎡
Project Nature: Gable Frame Industrial Plant Building Dimensions (L × W × H): 200 m × 160 m × 7.15 m

Egypt New Energy Project
Total Site Area: 24,820.29 ㎡
Total Floor Area: 26,952.70 ㎡
Project Nature: Office Building and Industrial Plant Building Dimensions (L × W × H): 150 m × 150 m × 7.325 m

项目案例-06
项目案例-05

Project Name: Ethiopian Poultry Farm Project. Construction Scale(L × W): 120 m × 15 m Structural Features: Light steel structure, connected by H-shaped steel, Z-shaped steel, and C-shaped steel components of the main steel frame. The roof and walls are constructed with 50mm rock wool sandwich panels, offering strong wind resistance.

Project Name: Zambia Steel Structure Warehouse Building Dimensions (L x W x H): 60 m x 30 m x 7 m Floor Area: 1,800 m2 Structural Features: Adopts a classic double-slope, double-span design with a central column inside. The main load-bearing structure utilizes high-strength H-shaped steel for both beams and columns, while the enclosure system is covered with high-performance metal panels for walls and roof.

项目案例-03
项目案例-07

A380 Hangar, Teruel, Spain The hangar walls are 34 m high with a span of 95 m.

项目案例-09

Regional Warehouse
Building area: 20,000 m2

Packaging and Transportation

详情-05

FAQ

Q: How can I get a quote?

A: Please provide your country, total building area, length, width, height, and intended use to receive a preliminary quote.

Q: Is your company a factory or a trading company?

A: We are a manufacturing factory. You are welcome to visit our facility anytime. After your tour, you will receive the most
favorable and competitive quote.

Q: Can you provide drawings? How do I build a custom structure?

A: You may provide your own drawings. If no specific plan exists, our professional design team can create one based on your
requirements and local climate conditions. A design fee applies.

Q: Can I modify the steel structure building design?

A: We understand projects involve multiple stakeholders—sponsors, partners, or even your own engineers—leading to numerous revision requests. We commit to modifying designs based on your feedback until final approval.

Q: Can you dispatch engineers or a team for project installation?

A: Yes. We provide detailed installation drawings and videos free of charge, and can additionally offer installation guidance,
on-site supervision, and operational training services. However, the buyer is responsible for covering the technical personnel's visa fees, round-trip airfare, accommodation, meals, and wages.

Q: Delivery lead time?

A: Lead time depends on order quantity. Typically, goods can be shipped to the nearest port in China within 30 days after receiving the deposit.

Q: Do you accept container loading inspections?

A: We welcome your representatives to conduct inspections. Supervision is permitted not only during loading but at any stage throughout production.

Contact Us

SUBMIT

RELATED PRODUCTS